EPC ( Engineering-Procurement-Construction)


All bases from site selection to realization and commissioning of the project are performed with exhaustive care. Service such as initiation and follow-up on all official permitting required for project realization and installation tests are carried out successfully.


EPC Site Selection


Solar Potential Status GPS position of potential area


When selecting a site for solar power plant, a primary requirement is the solar potential. The more solar radiation is present in the city/area where the power plant will be constructed, the more energy can be generated.


Sites's Soil Structure


The construction site’s topographic structure is critical. Initial budget costs may change if the project requires extra earthworks for rocky structures or subsequent construction phases.


Site’s Shading Status


Site surroundings should be surveyed during the site selection process. Any formation that might cast a shadow on the site will reduce the solar power plant’s yield (i.e. tall trees, buildings, mountains, etc.). If any high-voltage transmission line are over or near the site, they will also have an unfavourable effect on your panels and energy productivity.

Site’s Contamination and Powdering Status

Site status for a future power plant should be analysed for powder content near or around the area, whether from a concrete plant, stone quarry, or sand quarry. These powders will be carried by the winds onto your solar panels and contaminate them, requiring frequently cleaning to avoid substantially decreased productivity.


Site’s Connection with Energy Transmission Line


Solar power plant installation requires it to be connected to energy transmission line at a point designated by the energy distribution company. These transmission routes must be detailed and analysed.


Site’s Convenient Weather Conditions


The site region is critical for solar power plant installation. One must determine the sunny, foggy, rainy, and snowy conditions of the site location, plus obtain the meteorological data for the next year.


Site’s Transportation Status


Transportation is a major consideration. If accessing the site is a challenge, labour and transportation costs will be high in the initial investment. Recognize that some problems might arise in the transportation of solar panels, construction teams, and equipment such as transformer box due to site location and conditions.